Fee Model Reference

5-phase advisory lifecycle fee structure with MW-based revenue share capacity model

MW Under Advisory (Y5)
375 MW
5 facilities commissioned
Rev Share Income (Y5)
$9.7M
76% of total advisory
5-Year Cumulative Rev Share
$15.3M
63% of total 5yr revenue
Value-to-Fee Ratio (Y5)
1.7x
2.5% advisory premium at 150 bps

Revenue Share Capacity Model

MW under advisory drives revenue share — edit inputs below in blue

MetricYear 1Year 2Year 3Year 4Year 5
Portfolio Pipeline
New Facilities Commissioned
Avg MW per Facility
New MW Commissioned0 MW50 MW75 MW150 MW100 MW
Cumulative MW Under Advisory0 MW50 MW125 MW275 MW375 MW
Revenue per MW
Offtaker Rate ($/kW/mo)
Annual Revenue per MW$1.7M$1.7M$1.8M$1.9M$1.9M
Total Facility Revenue$0$87.0M$225.0M$511.5M$720.0M
Tiered Revenue Share
Avg Occupancy (%)
Blended Rev Share Rate (bps)
Occupied Revenue (basis)$0$47.9M$157.5M$419.4M$648.0M
Annual Revenue Share$0$239K$1.2M$4.2M$9.7M
Cumulative Revenue Share$0$239K$1.4M$5.6M$15.3M
Offtaker Value-Add (2.5% Advisory Premium)
Value Delivered to Client$0$1.2M$3.9M$10.5M$16.2M
Value-to-Fee Ratio-5.0x3.3x2.5x1.7x
Pipeline — Pre-Commissioning (Not Yet Revenue-Generating)
Facilities in Pipelinenot commissioned
Avg MW per Pipeline Facility
Pipeline MW in Development100 MW225 MW300 MW500 MW400 MW
Quarterly Retainer / Pipeline Facility
  Annual Retainer Revenue$200K$360K$640K$1.0M$880K
Avg Diligence Fee / Pipeline Facility
  Annual Diligence Revenue$100K$225K$500K$750K$700K
Dev Oversight Fee / Facility (annual)
  Annual Dev Oversight Revenue$50K$375K$900K$1.1M$1.4M
Total Pre-Commissioning Advisory Revenue$350K$960K$2.0M$2.9M$3.0M
Pipeline:Commissioned MW ratio4.50x2.40x1.82x1.07x
Revenue Share vs. Total Advisory
Other Advisory Revenue(from pipeline above)$350K$960K$2.0M$2.9M$3.0M
Revenue Share Income$0$239K$1.2M$4.2M$9.7M
Total Advisory Revenue$350K$1.2M$3.2M$7.0M$12.7M
Rev Share % of Total0%20%37%60%76%
Per-MW Unit Economics
Rev Share per MW-$5K$9K$15K$26K
Total Advisory per MW-$24K$26K$26K$34K
2.5%of annual offtaker revenue

Revenue Composition (5-Year)

MW Under Advisory vs. Rev Share

Revenue Share — Tiered Structure

Post-commissioning recurring revenue, scaling with facility performance

1Base Tier
50 bps
>50% Occupied
Facility reaches commercial viability threshold
2Growth Tier
100 bps
>80% Occupied
Approaching full capacity with proven demand
3Outperformance
150 bps
NOI Exceeded
Operating income beats underwritten projections
4Long-Term
200 bps
3+ Years
Sustained partnership with compounding value
Revenue share is the primary recurring revenue engine. At scale with 5 commissioned facilities and 375 MW under advisory, it represents 76% of total advisory revenue by Year 5. The 2.5% offtaker value-add means clients receive 1.7x the value of the fee - locking in offtakers is only one aspect of the value we deliver.

Fee Schedule by Phase

Click a phase to expand details

5-Year Total Advisory Revenue
$24.5M
5-Year Rev Share Income
$15.3M
Peak MW Under Advisory
375 MW
5-Year Value Delivered to Clients
$31.8M